Search Jobs

Senior Project Scheduler

Bellevue, WA 98008

Posted: 10/19/2026 Employment Type: Contract Job Number: 32521 Work Location: Remote Industry: SVCS - Services

Job Description

Position Title: Senior Project Scheduler
 
Position Description: Protingent Staffing has an exciting contract Senior Project Scheduler opportunity.
 
Job Responsibilities:
  • Develop and maintain an integrated baseline lifecycle schedule in P6.
  • Regularly update and provide weekly progress reports, layouts and publication of the master schedule. 
  • Identify and communicate variances from the original plan and weekly baseline snapshots.
  • Evaluate project schedule progress and performance and identify developing problem areas.
  • Process project change notices into P6 baseline and live schedule monthly.
  • Analyze critical path and constraints to determine the effect of progress changes to schedule and recommend
  • solutions to ensure baseline key milestones are achieved.
  • Support P6 administration functions to ensure EPPM data, global code fields, baseline copies and data interface to
  • other applications are maintained properly.
  • Assist with the facilitation of project review meetings, and project planning support as assigned and actively interact with project team members.
  • Assist and interact with team members to drive out continual improvement of schedule project controls metric and other performance indicators.

Job Qualifications:
  • Bachelor’s degree in engineering, Construction Management, or equivalent technical field preferred.
  • PMP, PMI-SP or AACE certificate is preferred.
  • Minimum of ten years of project scheduling experience, preferably including work in R&D, engineering and/or
  • Department of Energy (DOE O 413.3B) projects.
  • Proficiency in Oracle Primavera P6 and EPPM application.
  • Experience in MS Power BI Service, Oracle BI or other data analytics platforms.
  • Experience with Atlassian tools such as Confluence and JIRA a bonus.
  • Experience using Microsoft Project Online a bonus.
  • Strong analytical/problem solving skills, creative thinker.
  • Strong communication skills desired.
  • The successful candidate will possess a high degree of trust and integrity, communicate openly and display
  • respect, and a desire to foster teamwork.
  • Actual position starting level and title will be determined based on assessment of qualifications.
  • This position is subject to qualification requirements in accordance with ANSI/ANS 3.1. Candidates must meet the minimum education and experience criteria applicable to the role, including relevant nuclear industry experience where required. Verification of data will be part of the hiring process
  • Strong communication skills desired.
  • The service provider will possess a high degree of trust and integrity, communicate openly and display respect, and a desire to foster teamwork.
  • Travel Required: 0-5%

Job Details:
  • Job Type: Contract
  • Pay Rate Range: $52-$86/hr (Pay rates are approved based on candidate location, education and experience)
  • Location: 100% Remote
  • Export control regulations require candidates to be a U.S. Citizen, U.S. Legal Permanent Resident, or of a protected person status

Benefits Package: Protingent offers competitive salaries, insurance plan options (HDHP plan or POS plan), education/certification reimbursement, pre-tax commuter benefits, Paid Time Off (PTO), and an administered 401k plan.

About Protingent: Protingent is an Award-Winning provider of top-tier Engineering and IT talent, trusted by companies at the forefront of innovation — from Software and Aerospace to AI, Clean Tech, Medical Devices, and Connected Technologies. We’re passionate about making a positive impact by connecting exceptional talent with meaningful opportunities and helping our clients build the future. #TerraPro

Meet Your Recruiter

Kayla Nordby

As a Technical Recruiter at Protingent, I bring eight years of experience as a science teacher to the work of connecting engineering professionals with roles that fit their skills and goals. Teaching taught me to break down complex material, listen closely, and spot potential in people. Those strengths translate directly to understanding technical backgrounds and matching them with the right opportunity.

Helping someone find the right fit is why I love recruiting. Whether you’re looking for your next step, a career transition, or just a better match for your skills, I’ll listen first and work to find the role that fits your goals. 

Outside of work, I enjoy hiking and running. I’m originally from Texas, and I love living in the Pacific Northwest with my dogs! Let’s get started today!

Send an email reminder to:

Share This Job:

Related Jobs:

Login to save this search and get notified of similar positions.

About Bellevue, WA

Discover exciting job opportunities in the vibrant Bellevue, Washington area today! Nestled in the heart of the Pacific Northwest, Bellevue offers a perfect blend of urban sophistication and natural beauty. From the stunning views of Lake Washington and the Cascade Mountains to the bustling downtown area with its upscale shops and delightful eateries, Bellevue has something for everyone. Explore the Bellevue Arts Museum, catch a show at the Meydenbauer Center, or cheer on the Seattle Seahawks at the nearby Lumen Field. With top-rated schools, abundant outdoor recreational activities at Bellevue Downtown Park, and a thriving tech industry, Bellevue presents endless possibilities for professional growth and success. Begin your career journey in this dynamic and charming city - browse our job listings now and unlock your potential in Bellevue, Washington!