Search Jobs
Senior Project Scheduler
Job Description
Position Description: Protingent Staffing has an exciting *REMOTE* contract Senior Project Scheduler opportunity.
Job Responsibilities:
- Develop and maintain an integrated baseline lifecycle schedule in P6.
- Regularly update and provide weekly progress reports, layouts, and publication of the master schedule.
- Identify and communicate variances from the original plan and weekly baseline snapshots.
- Evaluate project schedule progress and performance, and identify developing problem areas.
- Process project change notices into the P6 baseline and live schedule monthly.
- Analyze critical path and constraints to determine the effect of progress changes to the schedule and recommend solutions to ensure baseline key milestones are achieved.
- Support P6 administration functions to ensure EPPM data, global code fields, baseline copies, and data interface to other applications are maintained properly.
- Assist with the facilitation of project review meetings and project planning support as assigned, and actively interact with project team members.
- Assist and interact with team members to drive out continual improvement of schedule, project controls, metrics, and other performance indicators.
Job Qualifications:
- Bachelor’s degree in Engineering, Construction Management, or equivalent technical field preferred.
- A PMP, PMI-SP, or AACE certificate is preferred.
- Minimum of ten years of project scheduling experience, preferably including work in R&D, engineering, and/or Department of Energy (DOE O 413.3B) projects.
- Proficiency in Oracle Primavera P6 and EPPM application.
- Experience in MS Power BI Service, Oracle BI, or other data analytics platforms.
- Experience with Atlassian tools such as Confluence and JIRA is a bonus.
- Experience using Microsoft Project Online is a bonus.
- Strong analytical/problem-solving skills, creative thinker.
- Strong communication skills are desired.
- The successful candidate will possess a high degree of trust and integrity, communicate openly and display respect, and have a desire to foster teamwork.
- The actual position starting level and title will be determined based on the assessment of qualifications.
Job Details:
- Job Type: Contract
- Pay Rate Range: $84 - $110/hr.
- Location: 100% Remote Acceptable
- Export control regulations require candidates to be a U.S. Citizen, a U.S. Legal Permanent Resident, or a protected person.
Benefits Package: Protingent offers competitive salaries, insurance plan options (HDHP plan or POS plan), education/certification reimbursement, pre-tax commuter benefits, Paid Time Off (PTO), and an administered 401 (k) plan.
About Protingent: Protingent is an Award-Winning provider of top-tier Engineering and IT talent, trusted by companies at the forefront of innovation — from Software and Aerospace to AI, Clean Tech, Medical Devices, and Connected Technologies. We’re passionate about making a positive impact by connecting exceptional talent with meaningful opportunities and helping our clients build the future.
Meet Your Recruiter
Laura Duarte
I have been in Technical Recruiting for over 20 years. I specialize in hiring people for technology, engineering, manufacturing, and operations jobs for various exciting industries nationwide, such as consumer electronics, medical devices, space/aerospace/avionics, and nuclear-clean energy. I will listen to you and guide you through the entire job application and interviewing process in a fun and clearly communicated way. My philosophy has always been to be an enthusiastic learner of new technologies and keep the big picture in mind while continuing to be honest, organized, and proactive. I am passionate about helping others find an exciting and fulfilling job that aligns with their goals. I am diversity-focused and especially love helping under-represented folks & Veterans into STEM careers. I approach every job seeker with empathy, equity, and respect.
Share This Job:
Related Jobs:
About Bellevue, WA
Are you sure you want to apply for this job?
Please take a moment to verify your personal information and resume are up-to-date before you apply.