Search Jobs

So sorry, this position is no longer available. Please go ahead and submit your application. We may have other positions that would be the perfect fit for you. Alternatively, you may want to apply to one of the following related jobs:

Senior Project Scheduler

Bellevue, WA 98008

Posted: 05/28/2024 Employment Type: Contract Department: Core Technologies - Contract Job Number: 28935 Industry: SVCS - Services

Job Description

Position Title: Senior Project Scheduler
 
Position Description: Protingent Staffing has an exciting REMOTE contract Senior Project Scheduler opportunity.
 
Job Responsibilities:
  • Develop and maintain an integrated baseline lifecycle schedule in P6.
  • Regularly update and provide weekly progress reports, layouts and publication of the master schedule.  
  • Identify and communicate variances from the original plan and weekly baseline snapshots.
  • Evaluate project schedule progress and performance and identify developing problem areas.
  • Process project change notices into P6 baseline and live schedule monthly.
  • Analyze critical path and constraints to determine the effect of progress changes to schedule and recommend solutions to ensure baseline key milestones are achieved.
  • Support P6 administration functions to ensure EPPM data, global code fields, baseline copies and data interface to other applications are maintained properly.
  • Assist with the facilitation of project review meetings, and project planning support as assigned and actively interact with project team members.
  • Assist and interact with team members to drive out continual improvement of schedule project controls metrics and other performance indicators.

Job Qualifications:
  • Bachelor’s degree in engineering, Construction Management, or equivalent technical field preferred.
  • PMP, PMI-SP or AACE certificate is preferred.
  • Minimum of five years of project scheduling experience, preferably including work in R&D, engineering and/or Department of Energy (DOE O 413.3B) projects.
  • Proficiency in Oracle Primavera P6 and EPPM application.
  • Experience in MS Power BI Service, Oracle BI or other data analytics platforms.
  • Experience with Atlassian tools such as Confluence and JIRA a bonus.
  • Experience using Microsoft Project Online a bonus.
  • Strong analytical/problem solving skills, creative thinker
  • Strong communication skills desired.
  • The successful candidate will possess a high degree of trust and integrity, communicate openly and display respect, and a desire to foster teamwork.
  • Actual position starting level and title will be determined based on assessment of qualifications.
 
Job Details:
  • Contract 
  • Pay Rate Range: $70- $100/h DOE
  • ITAR obligations are associated with this role, U.S. citizenship, U.S. legal permanent resident status, or protected person status under 8 U.S.C. § 1324b(a) (1), (3) is required.

Benefits Package: Protingent offers competitive salaries, insurance plan options (HDHP plan or POS plan), education/certification reimbursement, pre-tax commuter benefits, Paid Time Off (PTO), and an administered 401k plan.

About Protingent: Protingent is a niche provider of top Engineering and IT talent to Software, Electronics, Medical Device, Telecom, and Aerospace companies nationwide. Protingent exists to make a positive impact and contribution to the lives of others as well as our community by providing relevant, rewarding, and exciting work opportunities for our candidates.
 

Meet Your Recruiter

Kelsey Servin

I have been in the staffing industry since 2006. I started in HR and held roles as a recruiter, account manager, director of major accounts, and VP of recruiting and sales before settling into my passion for technical recruiting. My various roles and experiences allow me to understand the ins and outs of the industry. My recruiting style is collaborative, and I work closely with candidates to understand what exactly they are looking for in a role to align them with as many opportunities as possible. I am responsive, easy to work with, and transparent, so candidates always know where they are in the process. I can help you achieve whatever YOU want out of your next opportunity, whether it is career, cultural, or financial growth. I would love to be the one to find your next position, but at the end of the day, it is most important that you end up in the best fit for you and your family. I am a talent sleuth at heart and love the thrill of helping a candidate find their dream job or helping a manager find the perfect person for their team. I am super positive, very knowledgeable about the industry, and a huge foodie! Reach out to me for all the above! 

Send an email reminder to:

Share This Job:

Related Jobs:

Login to save this search and get notified of similar positions.

About Bellevue, WA

Discover exciting job opportunities in the vibrant Bellevue, Washington area today! Nestled in the heart of the Pacific Northwest, Bellevue offers a perfect blend of urban sophistication and natural beauty. From the stunning views of Lake Washington and the Cascade Mountains to the bustling downtown area with its upscale shops and delightful eateries, Bellevue has something for everyone. Explore the Bellevue Arts Museum, catch a show at the Meydenbauer Center, or cheer on the Seattle Seahawks at the nearby Lumen Field. With top-rated schools, abundant outdoor recreational activities at Bellevue Downtown Park, and a thriving tech industry, Bellevue presents endless possibilities for professional growth and success. Begin your career journey in this dynamic and charming city - browse our job listings now and unlock your potential in Bellevue, Washington!